Sweeney Playground


Sweeney Playground is a redesign of an existing half-acre park located in South Boston.  As a part of the City of Boston’s Capital Improvement Plan, the park was renovated in order to create a multifaceted landscape for all to enjoy.

The playground includes renovation to the existing basketball court, rope structures to climb, newly designed lighting and interactive water-based features.  It also features topographic elements that create fluctuations in the landscape, while incorporating stormwater infiltration through permeable surfaces and an infiltration basin.

180 West 5th Street, Boston, Massachusetts

Project Designer: Stoss
Scott Bishop as Principal in Charge

Bryant Engineering